Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Soils design, construction and performance observations, lookout Point dam, Oregon
Field explorations and laboratory tests to determine properties of foundation and borrow materials for design of 273 ft high dam with 2110 ft crest length containing 8 million cu yd of fill; gated concrete gravity spillway section has net opening of 212 ft and maximum discharge capacity of 268,000 cfs; piezometer and settlement observations indicated satisfactory performance of foundation and embankment.
Soils design, construction and performance observations, lookout Point dam, Oregon
Field explorations and laboratory tests to determine properties of foundation and borrow materials for design of 273 ft high dam with 2110 ft crest length containing 8 million cu yd of fill; gated concrete gravity spillway section has net opening of 212 ft and maximum discharge capacity of 268,000 cfs; piezometer and settlement observations indicated satisfactory performance of foundation and embankment.
Soils design, construction and performance observations, lookout Point dam, Oregon
US Waterways Experiment Station -- Tech Report
Sloan, R.C. (Autor:in)
1959
44 pages
9 Plates
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Highball dirt at Lookout Point
Engineering Index Backfile | 1952
|DESIGN REVIEW Timber lookout tower
British Library Online Contents | 2003
|