Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dam for hydroelectric project on Cheakamus River was built on 150 ft thick landslide deposit underlain by buried forest; dam is 1248 ft high and is made of landslide material; four gaging devices and five observation wells for observing performance of dam; 17 ft diam diversion tunnel; water reaches power plant at 1125 ft head.
Dam for hydroelectric project on Cheakamus River was built on 150 ft thick landslide deposit underlain by buried forest; dam is 1248 ft high and is made of landslide material; four gaging devices and five observation wells for observing performance of dam; 17 ft diam diversion tunnel; water reaches power plant at 1125 ft head.
Storage dam founded on landslide debris
Boston Soc Civ Engrs -- J
Terzaghi, K. (Autor:in)
1960
31 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Storage dam founded on landslide debris
TIBKAT | 1960
|Landslide Debris Movement Analysis
British Library Conference Proceedings | 1996
|Travel distance of landslide debris
British Library Conference Proceedings | 1996
|A landslide induced waterflood-debris flow
Online Contents | 1983
|Motion of landslide-induced debris flow
British Library Conference Proceedings | 2003
|