Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
3 1/2 mi long 4-lane, pile-supported deck slab bridge has elevated central portion to allow passing of small boats, and also 400 ft long navigational steel span with 50 ft clearance; prestressed piles, precast caps, and prestressed slabs are fabricated near New Orleans, La, and moved to Pensacola by barge for assembly; piles are 54 in. in diam and up to 164 ft long, and roadway slabs are 60 ft long by 31 ft wide.
3 1/2 mi long 4-lane, pile-supported deck slab bridge has elevated central portion to allow passing of small boats, and also 400 ft long navigational steel span with 50 ft clearance; prestressed piles, precast caps, and prestressed slabs are fabricated near New Orleans, La, and moved to Pensacola by barge for assembly; piles are 54 in. in diam and up to 164 ft long, and roadway slabs are 60 ft long by 31 ft wide.
Bridge towed 200 miles for erection
Civ Eng (NY)
Milhan, D.W. (Autor:in)
1960
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1898
|Erection of Columbia River Bridge erection
Engineering Index Backfile | 1894
BRIDGE ERECTION METHOD AND LAUNCHING MACHINE FOR BRIDGE ERECTION
Europäisches Patentamt | 2022
|Engineering Index Backfile | 1919
Engineering Index Backfile | 1933
|