Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Contractor places floating bridge anchors, gets back on schedule
7861 ft span across Hood Canal, Ore, is first floating bridge to be constructed in tidal waters; roadway on bridge is elevated to prevent automobiles from being sprayed with salt water; opening of 600 ft for passage of large ships; cathodic protection of anchor cables; use of light weight concrete in superstructure; post-stressing of concrete pontoons prevents shrinkage cracks; continuous loop anchor cables to permit renewal in deep water.
Contractor places floating bridge anchors, gets back on schedule
7861 ft span across Hood Canal, Ore, is first floating bridge to be constructed in tidal waters; roadway on bridge is elevated to prevent automobiles from being sprayed with salt water; opening of 600 ft for passage of large ships; cathodic protection of anchor cables; use of light weight concrete in superstructure; post-stressing of concrete pontoons prevents shrinkage cracks; continuous loop anchor cables to permit renewal in deep water.
Contractor places floating bridge anchors, gets back on schedule
Pac Bldr Engr
Ross, F.K. (Autor:in)
1959
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge contractor uses floating machine to cut underwater piles
Engineering Index Backfile | 1929
Analysis of Contractor Pay Adjustment Schedule Using Simulation
British Library Online Contents | 1996
|Analysis of Contractor Pay Adjustment Schedule Using Simulation
British Library Conference Proceedings | 1996
|Embedded suction anchors for floating breakwaters
British Library Conference Proceedings | 2003
|Client and contractor roles in schedule incentive/disincentive projects
Emerald Group Publishing | 2019
|