Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of 10 piers along Brooklyn shore of East River; 25 berths for modern cargo vessels provided with 90,000 sq ft of shedded space per berth; in construction of first four piers, creosoted piles 55 to 99 ft in length were used; piers are fireproofed by attachment of stay laths, through-bolted to piles, supported by reinforced concrete cylinders set over top of each pile; square of 1/2 in. asbestos cement plank cut to fit around pile.
Construction of 10 piers along Brooklyn shore of East River; 25 berths for modern cargo vessels provided with 90,000 sq ft of shedded space per berth; in construction of first four piers, creosoted piles 55 to 99 ft in length were used; piers are fireproofed by attachment of stay laths, through-bolted to piles, supported by reinforced concrete cylinders set over top of each pile; square of 1/2 in. asbestos cement plank cut to fit around pile.
Fireproof piers on creosoted wood piles
Civ Eng (NY)
Mann, R.H. (Autor:in)
1959
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete and creosoted wood piles compared
Engineering Index Backfile | 1934
Jackets of creosoted wood protect concrete piles
Engineering Index Backfile | 1957
|Creosoted piles on pacific coast
Engineering Index Backfile | 1914
|An unusual record for creosoted piles
Engineering Index Backfile | 1919
Brooklyn terminal market founded on creosoted piles
Engineering Index Backfile | 1943
|