Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water balance recorder
Design and construction of semi-floating lysimeter; installation consists of 2 tanks, one inside other; inner tank is partly floating and partly counterbalanced; based on change in weight, change in water level between tanks is amplified and recorded on clock-driven chart; results, based on use of such recorder.
Water balance recorder
Design and construction of semi-floating lysimeter; installation consists of 2 tanks, one inside other; inner tank is partly floating and partly counterbalanced; based on change in weight, change in water level between tanks is amplified and recorded on clock-driven chart; results, based on use of such recorder.
Water balance recorder
ASCE -- Proc (J Irrigation Drainage Div)
Aslyng, H.C. (Autor:in) / Kristensen, K.J. (Autor:in)
1961
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
ASCE | 2021
|Automatic water-hardness recorder
Engineering Index Backfile | 1934
The Graphic Water Level Recorder
Wiley | 1928
|Automatic Water Level Recorder for Wells
Wiley | 1939
|