Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Saint-Esteve-Janson hydroelectric development on Durance (River)
Project, as part of general Durance development, comprises 28.7 km long headrace canal of 250 cu m/sec capacity, 3.7 km tailrace canal intake-barrage spillway structure, and 3 235-m long 5.5 m diam steel pressure conduits and penstocks; power plant, utilizing 65 m head will produce 140,000 kw; tailrace will serve later as headrace canal for Mallemort power plant.
Saint-Esteve-Janson hydroelectric development on Durance (River)
Project, as part of general Durance development, comprises 28.7 km long headrace canal of 250 cu m/sec capacity, 3.7 km tailrace canal intake-barrage spillway structure, and 3 235-m long 5.5 m diam steel pressure conduits and penstocks; power plant, utilizing 65 m head will produce 140,000 kw; tailrace will serve later as headrace canal for Mallemort power plant.
Saint-Esteve-Janson hydroelectric development on Durance (River)
L'amenagement de la chute de Saint-Esteve-Janson sur la Durance
Weingaertner, P. (Autor:in)
Construction ; 16
1961
11 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1964
|The Durance and Verdon hydroelectric scheme
British Library Conference Proceedings | 1995
|Hydroelectric power plant on lower Durance River and Serre-Poncon earth dam
Engineering Index Backfile | 1956
|Hydroelectric power plant on lower Durance River and Serre-Poncon earth dam
Engineering Index Backfile | 1956
|Engineering Index Backfile | 1892
|