Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Electric traction in British Railways modernization plan
Electrification is chosen for those sections of railway which bear heaviest traffic, whether in terms of high ratio of ton miles per track mile or intense and frequent commuter traffic; with first 5 yr of Plan, 848 track miles have been electrified, and 470 multiple-unit trains and 76 locomotives have been built suitable for operation on third-rail system or on 25 kv a-c system at industrial frequency.
Electric traction in British Railways modernization plan
Electrification is chosen for those sections of railway which bear heaviest traffic, whether in terms of high ratio of ton miles per track mile or intense and frequent commuter traffic; with first 5 yr of Plan, 848 track miles have been electrified, and 470 multiple-unit trains and 76 locomotives have been built suitable for operation on third-rail system or on 25 kv a-c system at industrial frequency.
Electric traction in British Railways modernization plan
Instn Civ Engrs -- Proc
Warder, S.B. (Autor:in)
1961
20 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Contribution of civil engineering to British railways modernization plan
Engineering Index Backfile | 1961
|Electric traction on the orleans railways extension
Engineering Index Backfile | 1898
Elsevier | 1986