Meffrouch barrage
Barrage in Western Algeria is scheduled to be completed in May 1961; most of dam above ground level is constructed from precast concrete parts, which include vaults and their abutments, while foundations and hillside abutments, latter taking form of lengths of gravity dam, were cast in mass concrete; dam rises about 26 m above foundations, and has total crown length of 531 m; it comprises 17 vaults and 2 gravity end sections.
Meffrouch barrage
Barrage in Western Algeria is scheduled to be completed in May 1961; most of dam above ground level is constructed from precast concrete parts, which include vaults and their abutments, while foundations and hillside abutments, latter taking form of lengths of gravity dam, were cast in mass concrete; dam rises about 26 m above foundations, and has total crown length of 531 m; it comprises 17 vaults and 2 gravity end sections.