Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Forms and shores move without disassembly
Construction of roof of 2 320-ft diam 28-ft high prestressed concrete water tanks in Springfield, Mass; high scaffold frames each supporting 200 sq ft of forms are moved on dollies, and after completion of one tank they are moved to other by crane; frame and forms are never disassembled during construction.
Forms and shores move without disassembly
Construction of roof of 2 320-ft diam 28-ft high prestressed concrete water tanks in Springfield, Mass; high scaffold frames each supporting 200 sq ft of forms are moved on dollies, and after completion of one tank they are moved to other by crane; frame and forms are never disassembled during construction.
Forms and shores move without disassembly
Construction Methods Equipment
1960
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Stripping panels without removing shores
Engineering Index Backfile | 1926
|Underpinning New York public library without shores
Engineering Index Backfile | 1923
|Shores, stringers, sit tight as crew strips deck forms
Engineering Index Backfile | 1964
Complex forms and heavy shores used on award winning California bridge
Engineering Index Backfile | 1969
British Library Online Contents | 1997
|