Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ohio River's new stairway to Pittsburgh
Improvement program of Corps of Engineers; 46 old locks will be replaced by 19 new ones; large, new locks can be emptied and filled many times quicker than old ones and they will require 1/3 of former manpower; lock and dam structures, completed or under construction, are; McAlpine Lock, Markland Lock and Dam, Meldahl Lock and Dam, Greenup Locks and Dam, Pike Island Lock and Dam, and New Cumberland Locks and Dam; typical twin locks are 1200 and 600 ft long.
Ohio River's new stairway to Pittsburgh
Improvement program of Corps of Engineers; 46 old locks will be replaced by 19 new ones; large, new locks can be emptied and filled many times quicker than old ones and they will require 1/3 of former manpower; lock and dam structures, completed or under construction, are; McAlpine Lock, Markland Lock and Dam, Meldahl Lock and Dam, Greenup Locks and Dam, Pike Island Lock and Dam, and New Cumberland Locks and Dam; typical twin locks are 1200 and 600 ft long.
Ohio River's new stairway to Pittsburgh
Eng News-Rec
Jacobus, Jr., W.W. (Autor:in)
Engineering News-Record ; 166
1961
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
STAIRWAY SET, STAIRWAY, PACKAGING METHOD FOR STAIRWAY FOOTBOARD, AND STAIRWAY CONSTRUCTION METHOD
Europäisches Patentamt | 2016
|STAIRWAY SUBSTRATE STRUCTURE, STAIRWAY, AND CONSTRUCTION METHOD OF STAIRWAY
Europäisches Patentamt | 2018
|