Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Top and bottom casings seal deep caissons
Placing 151 concrete caissons in drilled 105 to 110 ft deep holes, reaching limestone bedrock, as foundation for apartment houses along Chicago River; 3 separate casings had to be used in each hole to seal off surrounding fill in upper layers and ground water in deeper portions.
Top and bottom casings seal deep caissons
Placing 151 concrete caissons in drilled 105 to 110 ft deep holes, reaching limestone bedrock, as foundation for apartment houses along Chicago River; 3 separate casings had to be used in each hole to seal off surrounding fill in upper layers and ground water in deeper portions.
Top and bottom casings seal deep caissons
Construction Methods Equipment
Schreiber, E.J. (Autor:in)
1961
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
World's deepest bottom-door type open-well caissons
Engineering Index Backfile | 1939
|Engineering Index Backfile | 1957
Deep caissons stabilize weak bank
Engineering Index Backfile | 1953
Deep open caissons for Bay bridge
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1934