Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of lower deck of George Washington bridge
Design data of approach construction on both banks; 12 lane depressed expressway between bridge and Henry Hudson Parkway including elevated sections of reinforced concrete; cut and cover tunneling on New Jersey side; new lower deck has 6 lanes; tower adjustments due to 20,000 tons of additional load; lower deck sections were completed on ground or on barges and were hoisted to secure them in place; use of suspended erection trolleys.
Construction of lower deck of George Washington bridge
Design data of approach construction on both banks; 12 lane depressed expressway between bridge and Henry Hudson Parkway including elevated sections of reinforced concrete; cut and cover tunneling on New Jersey side; new lower deck has 6 lanes; tower adjustments due to 20,000 tons of additional load; lower deck sections were completed on ground or on barges and were hoisted to secure them in place; use of suspended erection trolleys.
Construction of lower deck of George Washington bridge
Mun Engrs J
Druding, H.A. (Autor:in)
1961
24 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Erection of lower deck -- George Washington bridge
Engineering Index Backfile | 1960
|Design features of lower deck of George Washington bridge
Engineering Index Backfile | 1958
|George Washington bridge: Construction of substructure
Engineering Index Backfile | 1933
|