Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Use of new type of prestressed, TEE-shaped deck beams to replace 50 ft long timber bridge on access road to Chilliwack airport; beams 2 ft 10 in. high with 4 ft wide top flange, were laid side by side, and whole work was completed in one day.
Use of new type of prestressed, TEE-shaped deck beams to replace 50 ft long timber bridge on access road to Chilliwack airport; beams 2 ft 10 in. high with 4 ft wide top flange, were laid side by side, and whole work was completed in one day.
Prestressed bridge is erected in just a day
Eng Contract Rec
Laszlo, G. (Autor:in)
1961
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed bridge: 120-Ft span erected daily
Engineering Index Backfile | 1957
Prestressed precast bridge deck erected in eight days
Engineering Index Backfile | 1957
|Long prestressed-steel truss erected for belgian hangar
Engineering Index Backfile | 1954
|Redistribution of Stresses in Segmentally Erected Prestressed Concrete Bridges
UB Braunschweig | 1986
|