Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Red Deer River Bridge
Bridge is 750 ft long, 35 ft wide, and comprises 3 equal 148 ft spans; spans are composed of 4 prestressed concrete girders set at 9 ft centers; these girders were more economical than steel girders; tenders for both are compared; casting of 112 ton girders, stressing of cables by portable power stressing equipment, and placing by using 2 cranes of 60 ton capacity each.
Red Deer River Bridge
Bridge is 750 ft long, 35 ft wide, and comprises 3 equal 148 ft spans; spans are composed of 4 prestressed concrete girders set at 9 ft centers; these girders were more economical than steel girders; tenders for both are compared; casting of 112 ton girders, stressing of cables by portable power stressing equipment, and placing by using 2 cranes of 60 ton capacity each.
Red Deer River Bridge
Prestressed Concrete Inst -- J
Adam, G. (Autor:in) / de Wolff, D. (Autor:in)
1961
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Red Deer river bridge -- Alberta Central railway
Engineering Index Backfile | 1913
|Reliability-Based Load Management of the Red Deer River Bridge
British Library Conference Proceedings | 2008
|Comparison of load rating techniques for the Red Deer River Bridge
British Library Online Contents | 2011
|Comparison of load rating techniques for the Red Deer River Bridge
Online Contents | 2011
|Building Deer Isle-Sedgwick Bridge
Engineering Index Backfile | 1940
|