Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Templets double as forms, forms as Cofferdams
Piers of 1124 ft long railroad bridge near Sandpoint, Idaho, are founded on clusters of H-beam piles; all piles for each pier were driven through openings made in close-fitting timber templet; 60 ft piles were used and additional length was secured by splice-welding sections as needed; then template was provided with side walls and dewatered to be used for concreting of pier; templets were left in place with no effort at recovery.
Templets double as forms, forms as Cofferdams
Piers of 1124 ft long railroad bridge near Sandpoint, Idaho, are founded on clusters of H-beam piles; all piles for each pier were driven through openings made in close-fitting timber templet; 60 ft piles were used and additional length was secured by splice-welding sections as needed; then template was provided with side walls and dewatered to be used for concreting of pier; templets were left in place with no effort at recovery.
Templets double as forms, forms as Cofferdams
Construction Methods Equipment
1961
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1962
|UB Braunschweig | 1940
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1940
Engineering Index Backfile | 1950