Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge described will have total length of 6070 m; it is built as concrete girder bridge in 155 spans; prestressed spans over channel are 130 m long with 36 m vertical clearance; started at turn of 1967-1968 constructions are due for completion in Sept 1972. (30917)
Bridge described will have total length of 6070 m; it is built as concrete girder bridge in 155 spans; prestressed spans over channel are 130 m long with 36 m vertical clearance; started at turn of 1967-1968 constructions are due for completion in Sept 1972. (30917)
Oland bridge
Olandsbron
Carleson, S. (Autor:in)
Cement Och Betong ; 44
1969
4 pages
Aufsatz (Zeitschrift)
Schwedisch
© Metadata Copyright Elsevier B. V. All rights reserved.
CRACK-FREE "SURROUND CONCRETE" REPAIRS OLAND BRIDGE PIERS
Online Contents | 1994
|Online Contents | 1983
|SALT SOLUTION - Repair techniques on Öland.
Online Contents | 1994