Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Shaft sinking with chemical grout
Problem of sealing porous sandstone encountered in sinking 3000-ft shafts was solved through use of new chemical grout; at 2000 ft level, 100 ft thick, highly porous sandstone with high water inflow was encountered; treatment of sandstone bed to its entire depth was carried out from bottom of shaft through injections into series of holes; AM-9 chemical grout reduced water flow 95%.
Shaft sinking with chemical grout
Problem of sealing porous sandstone encountered in sinking 3000-ft shafts was solved through use of new chemical grout; at 2000 ft level, 100 ft thick, highly porous sandstone with high water inflow was encountered; treatment of sandstone bed to its entire depth was carried out from bottom of shaft through injections into series of holes; AM-9 chemical grout reduced water flow 95%.
Shaft sinking with chemical grout
Coal Age
Coal Age ; 66
1961
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Cement grout and compressed air in shaft sinking
Engineering Index Backfile | 1912
Engineering Index Backfile | 1902
|Engineering Index Backfile | 1948
|Tema Archiv | 2013
|