Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Efficient method of drainage in open pit mine fields of Nikopol basin
Thickness of overburden attains 80 m; slides of open pit slopes occur due to action of surface waters; this may be prevented by drainage trenches; underground method of drainage is less efficient.
Efficient method of drainage in open pit mine fields of Nikopol basin
Thickness of overburden attains 80 m; slides of open pit slopes occur due to action of surface waters; this may be prevented by drainage trenches; underground method of drainage is less efficient.
Efficient method of drainage in open pit mine fields of Nikopol basin
Tselesoobraznyi sposob osusheniya kar'ernykh polei Nikopol'skogo basseina
Popov, A.A. (Autor:in) / Shemetov, E.A. (Autor:in)
Gornyi Zhurnal ; 137
1961
4 pages
Aufsatz (Zeitschrift)
Russisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Use of assembled reinforced concrete supports in mine of Nikopol-Marganets trust
Engineering Index Backfile | 1961
|Industrial sintering of Nikopol manganese concentrates of grades II and III
Engineering Index Backfile | 1963
|Industrial sintering of Nikopol manganese concentrates of grades II and III
Engineering Index Backfile | 1963
|Production of silicomanganese from sintered Nikopol concentrates of grades II and III
Engineering Index Backfile | 1964
|Base of cinder-cast products manufacturing at JSC Nikopol Ferroalloy Plant
Tema Archiv | 2001
|