Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
"Photoprofile" method for execution, supervision and control of underground work
Survey of cross sectional profiles of tunnels; apparatus described is applicable to mines, quarries, and excavation in construction industry.
"Photoprofile" method for execution, supervision and control of underground work
Survey of cross sectional profiles of tunnels; apparatus described is applicable to mines, quarries, and excavation in construction industry.
"Photoprofile" method for execution, supervision and control of underground work
Methode "Photoprofil" pour la conduite, la surveillance et le controle des travaux souterrains leve de profils en travers de galerie
Meuriot, P. (Autor:in)
1952
10 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Execution, Supervision and Quality Control of Anchors
British Library Conference Proceedings | 1994
|CONSTRUCTION WORK EXECUTION METHOD AND CONSTRUCTION WORK EXECUTION DEVICE
Europäisches Patentamt | 2024
|Housing construction underground waterproof engineering supervision system
Europäisches Patentamt | 2020
|CONSTRUCTION WORK EXECUTION METHOD AND CONSTRUCTION WORK EXECUTION DEVICE
Europäisches Patentamt | 2024
|Specification and supervision of plaster work
Engineering Index Backfile | 1930
|