Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Development of erection of girder bridges
Review of progress in methods of placing steel spans; gin poles, gallows frames, and hand tackle superseded by locomotive cranes, up to 100 tons in capacity, by steel movable derricks, and booms up to 80 ft in length; girder-erection methods; launching of span with cableway; erection with traveling towers, and on intermediate crib pier; girders erected by transverse displacement. (See also Civ Eng (NY) v 2 n 6 June 1932 p 349-54)
Development of erection of girder bridges
Review of progress in methods of placing steel spans; gin poles, gallows frames, and hand tackle superseded by locomotive cranes, up to 100 tons in capacity, by steel movable derricks, and booms up to 80 ft in length; girder-erection methods; launching of span with cableway; erection with traveling towers, and on intermediate crib pier; girders erected by transverse displacement. (See also Civ Eng (NY) v 2 n 6 June 1932 p 349-54)
Development of erection of girder bridges
Gen Contractors Assn -- Bul
Skinner, F.W. (Autor:in)
1932
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Development of erection of girder bridges
Engineering Index Backfile | 1932
|The erection of girder bridges
Engineering Index Backfile | 1909
|Design and erection of curved girder bridges
Engineering Index Backfile | 1965
|Fabrication and erection of steel plate girder railway bridges
Engineering Index Backfile | 1954
|Erection Engineering Analysis for Curved and Skewed Girder Bridges
British Library Conference Proceedings | 2012
|