Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction of twin concrete-jacketed 54-in. steel pipe line across south end of San Francisco Bay for delivery of Hetch Hetchy water to San Francisco peninsula reservoirs; pipes were laid in 120-ft lengths on submarine pile trestle constructed by divers; placing pipe sections; pipe manufacture; unit prices on major items. (See also Eng News-Rec v 116 n 23 June 4 1936 p 797-800)
Design and construction of twin concrete-jacketed 54-in. steel pipe line across south end of San Francisco Bay for delivery of Hetch Hetchy water to San Francisco peninsula reservoirs; pipes were laid in 120-ft lengths on submarine pile trestle constructed by divers; placing pipe sections; pipe manufacture; unit prices on major items. (See also Eng News-Rec v 116 n 23 June 4 1936 p 797-800)
Submarine pipe lines for water
Genie Civil
Stocker, L.W. (Autor:in)
Genie Civil ; 109
1936
2 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Submarine pipe lines for water
Engineering Index Backfile | 1936
|Protect submarine cables and pipe lines by burial
Tema Archiv | 1986
|The location of leaks in submarine pipe lines
Engineering Index Backfile | 1915
|Engineering Index Backfile | 1929