Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
History, design and construction of first 7 mi of Moscow subway; geological conditions encountered and their effect on planning and construction; construction methods; open air tunneling; German method of tunneling with compressed air; caisson method; shield tunneling; Berlin open cut method; Parisian trench method; ground solidification widely used; concrete mixed locally; administration of work. (See also - discussion v 117 n 3 July 16 p 94 and n 14 Oct p 488)
History, design and construction of first 7 mi of Moscow subway; geological conditions encountered and their effect on planning and construction; construction methods; open air tunneling; German method of tunneling with compressed air; caisson method; shield tunneling; Berlin open cut method; Parisian trench method; ground solidification widely used; concrete mixed locally; administration of work. (See also - discussion v 117 n 3 July 16 p 94 and n 14 Oct p 488)
Moscow subway
Eng News-Rec
Gutmann, I. (Autor:in)
Engineering News-Record ; 116
1936
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1935
|The Future of Subway Construction in Moscow
British Library Conference Proceedings | 1995
|Reports on design and construction of first Moscow subway
Engineering Index Backfile | 1935
|Report on design and construction of new subway of Moscow
Engineering Index Backfile | 1936
|Absorbents for plastering of tubing of second line of Moscow subway
Engineering Index Backfile | 1938
|