Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building roads through unstable formations
Methods for sinking fill to solid bottom by use of explosives and controlling its settlement by same means; "wedge" method; preliminary study of site; toe-dump method of settling fill. (see also Surveyor v 90 n 2320 July 10 1936 p 36)
Building roads through unstable formations
Methods for sinking fill to solid bottom by use of explosives and controlling its settlement by same means; "wedge" method; preliminary study of site; toe-dump method of settling fill. (see also Surveyor v 90 n 2320 July 10 1936 p 36)
Building roads through unstable formations
Civ Eng (NY)
Jeffries, J.N. (Autor:in)
1936
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Building roads through unstable formations
Engineering Index Backfile | 1936
|Tema Archiv | 2001
British Library Online Contents | 2003
Building California concrete roads
Engineering Index Backfile | 1926