Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steep concrete face on rockfill dam in China
Construction of rock-fill dam, 275 ft max height, 695 ft long, on Shing Mun River near Kowloon, China; consists of thin reinforced-concrete upstream face backed with low-grade concrete thrust block, sand wedge and mass of rock fill; cut-off wall; thrust block design; sand wedge distributes pressure.
Steep concrete face on rockfill dam in China
Construction of rock-fill dam, 275 ft max height, 695 ft long, on Shing Mun River near Kowloon, China; consists of thin reinforced-concrete upstream face backed with low-grade concrete thrust block, sand wedge and mass of rock fill; cut-off wall; thrust block design; sand wedge distributes pressure.
Steep concrete face on rockfill dam in China
Eng News-Rec
Engineering News-Record ; 117
1936
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 2009
|Rockfill Modulus and Settlement of Concrete Face Rockfill Dams
Online Contents | 2003
|Rockfill Modulus and Settlement of Concrete Face Rockfill Dams
British Library Online Contents | 2003
|The Concrete Face Rockfill Dam
British Library Conference Proceedings | 1997
|Analysis of Stress and Deformation of Rockfill and Concrete Face for High Concrete Face Rockfill Dam
Trans Tech Publications | 2014
|