Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
July 23 n 4 p 105-109: Review of 1 yr's progress in construction of world's largest earth dam; hydraulic filling on main dam, driving of diversion tunnels and construction of spillway; control shafts; channel lining. Aug 6 n 6 p 188-194: Dredge plant characteristics and hydraulic-fill operations; description of plant; increasing performance; plant changes; current year's operations; building dike; daily report of dredging operations. Aug 13 n 7 p 238-243: Tunnel enlargement and lining; ingenious adaptation of top heading and bench method overcomes difficult problem of enlarging large bores in treacherous shale; lining follows close behind excavation.
July 23 n 4 p 105-109: Review of 1 yr's progress in construction of world's largest earth dam; hydraulic filling on main dam, driving of diversion tunnels and construction of spillway; control shafts; channel lining. Aug 6 n 6 p 188-194: Dredge plant characteristics and hydraulic-fill operations; description of plant; increasing performance; plant changes; current year's operations; building dike; daily report of dredging operations. Aug 13 n 7 p 238-243: Tunnel enlargement and lining; ingenious adaptation of top heading and bench method overcomes difficult problem of enlarging large bores in treacherous shale; lining follows close behind excavation.
Fort peck dam today
Eng News-Rec
Richardson, H.W. (Autor:in)
Engineering News-Record ; 117
1936
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Fort peck dam today -- IV. grouting tunnels
Engineering Index Backfile | 1936
|ASCE | 2021
|Engineering Index Backfile | 1942
|Engineering Index Backfile | 1934
|Engineering Index Backfile | 1941
|