Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction and testing of hydraulic models, Muskingum water-shed project
Hydraulic model studies on 11 of dams for Muskingum Water-Shed Project, north of Zanesville, Ohio; laboratory facilities used in tests; features of model fabrication, operation, and test procedure; cost of doing work; test observations of special importance; relation between capacity of prototype and model.
Construction and testing of hydraulic models, Muskingum water-shed project
Hydraulic model studies on 11 of dams for Muskingum Water-Shed Project, north of Zanesville, Ohio; laboratory facilities used in tests; features of model fabrication, operation, and test procedure; cost of doing work; test observations of special importance; relation between capacity of prototype and model.
Construction and testing of hydraulic models, Muskingum water-shed project
Am Soc Civ Engrs -- Proc
Barnes, G.E. (Autor:in) / Jobes, J.G. (Autor:in)
1936
18 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction and testing of hydraulic models muskingum water-shed project
Engineering Index Backfile | 1938
|Construction and testing of hydraulic models, muskingum water-shed project
Engineering Index Backfile | 1937
|Construction and testing of hydraulic models muskingum water-shed project
Engineering Index Backfile | 1938
|Discussion of “Edwards on Muskingum Water-Shed Project”
ASCE | 2021
|