Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Half-Ton, "Leaping Lena" compacts earthfill on dam
Use of German gasoline tamper, manufactured by Delmag Co, in construction of San Gabriel Dam No. 1, near Los Angeles; explosions from gasoline engine lift tamper off ground and inclined bottom causes it to move forward as well as upward in its leap.
Half-Ton, "Leaping Lena" compacts earthfill on dam
Use of German gasoline tamper, manufactured by Delmag Co, in construction of San Gabriel Dam No. 1, near Los Angeles; explosions from gasoline engine lift tamper off ground and inclined bottom causes it to move forward as well as upward in its leap.
Half-Ton, "Leaping Lena" compacts earthfill on dam
Eng News-Rec
Baumann, P. (Autor:in)
Engineering News-Record ; 116
1936
Aufsatz (Zeitschrift)
Unbekannt
© Metadata Copyright Elsevier B. V. All rights reserved.
Europe's highest earthfill dam
Engineering Index Backfile | 1957
Building trio of earthfill dams
Engineering Index Backfile | 1949
Engineering Index Backfile | 1937
Engineering Index Backfile | 1943
|Earthfill damming "down under,"
Engineering Index Backfile | 1948
|