Elevated steel tank moved 266 ft by horse team without springing leak
Three parallel tracks carried water tower and tank on skids from original location to new concrete foundations; timber cribbing placed under four legs and standpipe preparatory to moving.
Elevated steel tank moved 266 ft by horse team without springing leak
Three parallel tracks carried water tower and tank on skids from original location to new concrete foundations; timber cribbing placed under four legs and standpipe preparatory to moving.
Elevated steel tank moved 266 ft by horse team without springing leak
Construction Methods
1943
Aufsatz (Zeitschrift)
Englisch