Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Some points in connection with design and construction of trunk roads
Author claims that in post war period in order ot improve and speed up construction, alterations in existing method of preparing schemes will have to be considered; points which cause delay include land acquisition, too small sections dealt with at one time, financial considerations, bridge design, and lack of standard methods for road junctions on trunk roads.
Some points in connection with design and construction of trunk roads
Author claims that in post war period in order ot improve and speed up construction, alterations in existing method of preparing schemes will have to be considered; points which cause delay include land acquisition, too small sections dealt with at one time, financial considerations, bridge design, and lack of standard methods for road junctions on trunk roads.
Some points in connection with design and construction of trunk roads
Surveyor
Thorburn, W. (Autor:in)
1943
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1910
|Self-compacting concrete in bridge construction on federal trunk roads
British Library Conference Proceedings | 2007
|Some points to observe in the construction of concrete roads
Engineering Index Backfile | 1919
|TIBKAT | 1977
|Design of trunk roads for high speed and safety
Engineering Index Backfile | 1939
|