Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Process scheduling for prefabricated construction based on multi-objective optimization algorithm
Process scheduling for prefabricated construction based on multi-objective optimization algorithm
Process scheduling for prefabricated construction based on multi-objective optimization algorithm
Automation in Construction
Li, Yan (Autor:in) / Wu, Jiajun (Autor:in) / Hao, Yi (Autor:in) / Gao, Yuchen (Autor:in) / Chai, Runqi (Autor:in) / Chai, Senchun (Autor:in) / Zhang, Baihai (Autor:in)
Automation in Construction ; 168 ; 105809
01.12.2024
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
GA-based multi-objective optimization of finance-based construction project scheduling
Springer Verlag | 2010
|British Library Online Contents | 2016
|