Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A BIM-based approach for automated tower crane layout planning
Abstract Tower crane layout design and planning within construction site is a common construction technical issue, and is regarded as a complex combinatorial problem. Previous research focused on utilising either mathematical methods or visualisation tools to find an optimal tower crane layout plan. Both these two approaches require large amounts of manual data input by the layout planners, which is time-consuming and not very practical in industry. The purpose of this paper is to develop an integrated approach which combines Building Information Modelling (BIM) and Firefly Algorithm (FA) to automatically generate an optimal tower crane layout plan. Firstly, BIM is utilised to provide inputs for the mathematical model. Then the FA is used to determine the optimal locations of tower cranes and supply points. Finally, the optimal tower crane layout scheme will be visualised and evaluated through BIM-based simulation. A practical case is selected to demonstrate the proposed approach. The final result is promising and demonstrates the practical value of this approach.
Highlights Integrate BIM and firefly algorithm for automated tower crane layout planning Demonstrate practical value of the proposed approach in a real case The optimum solution from the proposed approach is promising.
A BIM-based approach for automated tower crane layout planning
Abstract Tower crane layout design and planning within construction site is a common construction technical issue, and is regarded as a complex combinatorial problem. Previous research focused on utilising either mathematical methods or visualisation tools to find an optimal tower crane layout plan. Both these two approaches require large amounts of manual data input by the layout planners, which is time-consuming and not very practical in industry. The purpose of this paper is to develop an integrated approach which combines Building Information Modelling (BIM) and Firefly Algorithm (FA) to automatically generate an optimal tower crane layout plan. Firstly, BIM is utilised to provide inputs for the mathematical model. Then the FA is used to determine the optimal locations of tower cranes and supply points. Finally, the optimal tower crane layout scheme will be visualised and evaluated through BIM-based simulation. A practical case is selected to demonstrate the proposed approach. The final result is promising and demonstrates the practical value of this approach.
Highlights Integrate BIM and firefly algorithm for automated tower crane layout planning Demonstrate practical value of the proposed approach in a real case The optimum solution from the proposed approach is promising.
A BIM-based approach for automated tower crane layout planning
Wang, Jun (Autor:in) / Zhang, Xuedong (Autor:in) / Shou, Wenchi (Autor:in) / Wang, Xiangyu (Autor:in) / Xu, Bo (Autor:in) / Kim, Mi Jeong (Autor:in) / Wu, Peng (Autor:in)
Automation in Construction ; 59 ; 168-178
27.05.2015
11 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
A BIM-based approach for automated tower crane layout planning
Online Contents | 2015
|A BIM-based approach for automated tower crane layout planning
British Library Online Contents | 2015
|A BIM-based approach for automated tower crane layout planning
British Library Online Contents | 2015
|