Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Failure analysis of a 12Cr1MoV superheater tube after 280,000 h of service
Failure analysis of a 12Cr1MoV superheater tube after 280,000 h of service
Failure analysis of a 12Cr1MoV superheater tube after 280,000 h of service
Nuclear Materials and Energy
Wang, Zhicheng (Autor:in) / Zhao, Jianping (Autor:in) / Cai, Hongxiang (Autor:in) / Chai, Guoqiang (Autor:in)
Nuclear Materials and Energy ; 40 ; 101707
01.09.2024
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Failure analysis of a 12Cr1MoV superheater tube after 280,000 h of service
DOAJ | 2024
|Superheater Tube-Bank Fracture Analysis
British Library Online Contents | 2000
|Failure Analysis of Superheater Outlet Header
British Library Online Contents | 2000
|British Library Online Contents | 2017
|Europäisches Patentamt | 2024
|