Double-O-Tube shield tunneling for Taoyuan International Airport Access MRT
Highlights ► Twenty projects conducted with Double-O-Tube (DOT) shield tunneling are summarized. ► DOT tunneling for Taoyuan International Airport Access MRT is introduced. ► Compared with single-circular shield tunneling, ground loss due to DOT tunneling was low. ► DOT tunneling would increase tunneling duration for about 32%. ► The cost per meter of DOT tunneling was about 1.5 times that for single-circular shields.
Abstract From 1989 to 2010, 20 tunneling projects have been carried out with the Double-O-Tube (DOT) shield tunneling method in the world. In this paper, the DOT shield tunneling for the construction of Taoyuan International Airport Access (TIAA) Mass Rapid Transit (MRT) system is introduced. A 6.42m-diameter, 11.62m-wide DOT shield machine was used to build the first DOT tunnel in Taiwan. Field data indicated that, throughout the tunneling operation, the rolling angle of the DOT shield varied between +0.23° and −0.39°, which was within the limiting design values of +0.6° and −0.6° proposed by both TIAA MRT and Shanghai Metro. For the six surface settlement troughs collected from Tokyo, Shanghai and Taipei, the ground loss due to DOT shield tunneling ranged from 0.23% to 1.30%, and the average ground loss was 0.78%. As compared with the ground loss due to single-circular Earth-Pressure-Balance (EPB) shield tunneling in cohesive soils, the range of ground loss due to DOT shield tunneling was relatively narrow, and the peak ground loss value was significantly less. Underground excavation with the DOT tunneling method would increase the tunneling duration for about 32%. The cost per meter of tunnel constructed with a DOT shield was about 1.5 times that constructed with single-circular shields. The cost of shield machine and segment lining were 23% and 53% of the total tunneling costs respectively. The expensive DOT shield machine and the complicated manufacturing and assembly of DOT lining segments are the main reasons for higher cost of tunneling. However, it would cost a lot more budget and it would be much more risky to excavate three cross-passages between the single-circular tunnels under the river.
Double-O-Tube shield tunneling for Taoyuan International Airport Access MRT
Highlights ► Twenty projects conducted with Double-O-Tube (DOT) shield tunneling are summarized. ► DOT tunneling for Taoyuan International Airport Access MRT is introduced. ► Compared with single-circular shield tunneling, ground loss due to DOT tunneling was low. ► DOT tunneling would increase tunneling duration for about 32%. ► The cost per meter of DOT tunneling was about 1.5 times that for single-circular shields.
Abstract From 1989 to 2010, 20 tunneling projects have been carried out with the Double-O-Tube (DOT) shield tunneling method in the world. In this paper, the DOT shield tunneling for the construction of Taoyuan International Airport Access (TIAA) Mass Rapid Transit (MRT) system is introduced. A 6.42m-diameter, 11.62m-wide DOT shield machine was used to build the first DOT tunnel in Taiwan. Field data indicated that, throughout the tunneling operation, the rolling angle of the DOT shield varied between +0.23° and −0.39°, which was within the limiting design values of +0.6° and −0.6° proposed by both TIAA MRT and Shanghai Metro. For the six surface settlement troughs collected from Tokyo, Shanghai and Taipei, the ground loss due to DOT shield tunneling ranged from 0.23% to 1.30%, and the average ground loss was 0.78%. As compared with the ground loss due to single-circular Earth-Pressure-Balance (EPB) shield tunneling in cohesive soils, the range of ground loss due to DOT shield tunneling was relatively narrow, and the peak ground loss value was significantly less. Underground excavation with the DOT tunneling method would increase the tunneling duration for about 32%. The cost per meter of tunnel constructed with a DOT shield was about 1.5 times that constructed with single-circular shields. The cost of shield machine and segment lining were 23% and 53% of the total tunneling costs respectively. The expensive DOT shield machine and the complicated manufacturing and assembly of DOT lining segments are the main reasons for higher cost of tunneling. However, it would cost a lot more budget and it would be much more risky to excavate three cross-passages between the single-circular tunnels under the river.
Double-O-Tube shield tunneling for Taoyuan International Airport Access MRT
Fang, Yung-Show (Autor:in) / Kao, Chung-Cheng (Autor:in) / Shiu, Yu-Fen (Autor:in)
Tunnelling and Underground Space Technology ; 30 ; 233-245
18.03.2012
13 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Double-O-Tube shield tunneling for Taoyuan International Airport Access MRT
British Library Online Contents | 2012
|Double-O-Tube shield tunneling for Taoyuan International Airport Access MRT
Online Contents | 2012
|Steel mountains Taoyuan Sewage Treatment Project, Taoyuan, Taiwan