Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cross-organization process integration in design–build team
AbstractCombining the design–build and fast-tracking delivery methods, this study aimed to reengineering the fast-tracking processes across both organizations of designer and constructor, so that fast-tracking processes in the design–build team can span across organizational boundaries and are composed of cooperating workflows executed in different organizations. For this purpose, two subjects are described in this study, namely, (1) fast-tracking model creation, and (2) cross-organizational process reengineering. Consequently, this research addressed a mechanism to facilitate the flexibility of cross-organizational process integration, which may assess alliance of design and construction companies for one design–build project.
Cross-organization process integration in design–build team
AbstractCombining the design–build and fast-tracking delivery methods, this study aimed to reengineering the fast-tracking processes across both organizations of designer and constructor, so that fast-tracking processes in the design–build team can span across organizational boundaries and are composed of cooperating workflows executed in different organizations. For this purpose, two subjects are described in this study, namely, (1) fast-tracking model creation, and (2) cross-organizational process reengineering. Consequently, this research addressed a mechanism to facilitate the flexibility of cross-organizational process integration, which may assess alliance of design and construction companies for one design–build project.
Cross-organization process integration in design–build team
Cheng, Min-Yuan (Autor:in) / Tsai, Ming-Hsiu (Autor:in)
Automation in Construction ; 17 ; 151-162
01.01.2006
12 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Cross-organization process integration in design–build team
Online Contents | 2008
|Cross-organization process integration in design-build team
British Library Conference Proceedings | 2008
|Cross-organization process integration in design–build team
British Library Online Contents | 2008
|AN EXPLORATION OF TEAM INTEGRATION IN DESIGN-BID-BUILD PROJECTS
TIBKAT | 2020
|Quantitative Methods for Design-Build Team Selection
Online Contents | 2010
|