Highlights Numerical analysis was employed to estimate the jacking force. The displacement control jacking force estimation model was established. This study focused on two pipe jacking cases in gravel formations. The monitoring data was used to establish and verify the model. The results suggest the applicability of developed model.
Abstract For a pipe jacking construction, reducing the soil–pipe interface friction and providing enough jacking force are the most common approach to optimize the construction efficiency. In practice, jacking force is generally estimated by various empirical equations. However, the estimations of empirical equations frequently deviate from the reality. In this study, a model coupling finite element method and a displacement control method were applied to estimate the required jacking force in pipe jacking. Two cases were examined from Central Taiwan, where the primary geological foundation composed of gravel formations. Case A pertained to pipe jacking construction during which sewage pipes with a diameter of 2.4m were utilized. The monitoring data from this case were used to establish the jacking force estimation model. The jacking force history observed in Case B, in which sewage pipes of 1.0m diameter were used, was compared with those obtained by the developed model to demonstrate the applicability of the model. The results suggested the developed model can estimate the jacking force with a better accuracy towards the middle and the final stage of the pipe jacking process.
Highlights Numerical analysis was employed to estimate the jacking force. The displacement control jacking force estimation model was established. This study focused on two pipe jacking cases in gravel formations. The monitoring data was used to establish and verify the model. The results suggest the applicability of developed model.
Abstract For a pipe jacking construction, reducing the soil–pipe interface friction and providing enough jacking force are the most common approach to optimize the construction efficiency. In practice, jacking force is generally estimated by various empirical equations. However, the estimations of empirical equations frequently deviate from the reality. In this study, a model coupling finite element method and a displacement control method were applied to estimate the required jacking force in pipe jacking. Two cases were examined from Central Taiwan, where the primary geological foundation composed of gravel formations. Case A pertained to pipe jacking construction during which sewage pipes with a diameter of 2.4m were utilized. The monitoring data from this case were used to establish the jacking force estimation model. The jacking force history observed in Case B, in which sewage pipes of 1.0m diameter were used, was compared with those obtained by the developed model to demonstrate the applicability of the model. The results suggested the developed model can estimate the jacking force with a better accuracy towards the middle and the final stage of the pipe jacking process.
Numerical simulation for the estimation the jacking force of pipe jacking
Tunnelling and Underground Space Technology ; 49 ; 218-229
23.04.2015
12 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Numerical simulation for the estimation the jacking force of pipe jacking
Online Contents | 2015
|Online Contents | 1994
Pipe jacking device and pipe jacking construction process
Europäisches Patentamt | 2020
|Engineering Index Backfile | 1933
|Situ Testing Study on Jacking Force of Manual Pipe-Jacking with Engineering
Trans Tech Publications | 2013
|