Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Development of ITER first wall heat load feedback control
Development of ITER first wall heat load feedback control
Development of ITER first wall heat load feedback control
Nuclear Materials and Energy
Pesamosca, Federico (Autor:in) / Ravensbergen, Timo (Autor:in) / Pitts, Richard A. (Autor:in) / Frattolillo, Domenico (Autor:in) / Erroi, Mattia (Autor:in) / Deliege, Quentin (Autor:in) / de Vries, Peter C. (Autor:in) / Zabeo, Luca (Autor:in) / Pangione, Luigi (Autor:in) / Carvalho, Ivo S. (Autor:in)
Nuclear Materials and Energy ; 41 ; 101781
01.12.2024
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Allowable heat load on the edge of the ITER first wall panel beryllium flat tiles
DOAJ | 2017
|Comparison of JET inner wall erosion in the first three ITER-like wall campaigns
DOAJ | 2021
|Wall spraying device achieving pressure load feedback
Europäisches Patentamt | 2015
|DOAJ | 2017
|