Lining design for the district heating tunnel in Copenhagen with steel fibre reinforced concrete segments
AbstractThe 3.9km long district heating tunnel carries heating pipelines from a power plant on the island Amager into the centre of Copenhagen. A shaft on Amager and two shafts in the city centre provide access to the tunnel, which is located within the Copenhagen limestone at a depth between 25 and 38m below the ground surface. The tunnel is excavated with an earth pressure balance (EPB) shield machine and is lined with steel fibre reinforced concrete (SFRC) segments without any conventional steel bar reinforcement. This represents an advantageous and innovative technical as well as cost-efficient solution. This paper presents the methods applied in the structural and durability design of the SFRC segmental lining for a specified service life of 100 years. Special attention is required due to the temperature increase in the tunnel to approximately 50°C during operation of the pipelines. The experiences with the SFRC segments during construction of the tunnel are discussed.
Lining design for the district heating tunnel in Copenhagen with steel fibre reinforced concrete segments
AbstractThe 3.9km long district heating tunnel carries heating pipelines from a power plant on the island Amager into the centre of Copenhagen. A shaft on Amager and two shafts in the city centre provide access to the tunnel, which is located within the Copenhagen limestone at a depth between 25 and 38m below the ground surface. The tunnel is excavated with an earth pressure balance (EPB) shield machine and is lined with steel fibre reinforced concrete (SFRC) segments without any conventional steel bar reinforcement. This represents an advantageous and innovative technical as well as cost-efficient solution. This paper presents the methods applied in the structural and durability design of the SFRC segmental lining for a specified service life of 100 years. Special attention is required due to the temperature increase in the tunnel to approximately 50°C during operation of the pipelines. The experiences with the SFRC segments during construction of the tunnel are discussed.
Lining design for the district heating tunnel in Copenhagen with steel fibre reinforced concrete segments
Kasper, Thomas (Autor:in) / Edvardsen, Carola (Autor:in) / Wittneben, Gert (Autor:in) / Neumann, Dieter (Autor:in)
Tunnelling and Underground Space Technology ; 23 ; 574-587
02.11.2007
14 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
British Library Online Contents | 2008
|TUNNEL SEGMENTS OF SELF-COMPACTING STEEL FIBRE REINFORCED CONCRETE
British Library Conference Proceedings | 2003
|Durability design of concrete tunnel lining segments
British Library Conference Proceedings | 2000
|British Library Online Contents | 2014
|