Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Overvoltage prevention in LV smart grid using customer resources coordination
Highlights ► A new robust and effective voltage rise control approach. ► Application of consensus algorithm to coordinate customers resources. ► Keeping robustness even with communication drop occurrence.
Abstract Voltage rise is one of the main factors which limits the capacity of Low Voltage (LV) network to accommodate more Renewable Energy (RE) sources. This paper proposes a robust and effective approach to coordinate customers’ resources and manage voltage rise in residential LV networks. PV is considered as the customer RE source. The suggested coordination approach in this paper includes both localized control strategy, based on local measurement, and distributed control strategy based on consensus algorithm. This approach can completely avoid maximum permissible voltage limit violation. A typical residential LV network is used as the case study where the simulated results are shown to verify the effectiveness of the proposed approach.
Overvoltage prevention in LV smart grid using customer resources coordination
Highlights ► A new robust and effective voltage rise control approach. ► Application of consensus algorithm to coordinate customers resources. ► Keeping robustness even with communication drop occurrence.
Abstract Voltage rise is one of the main factors which limits the capacity of Low Voltage (LV) network to accommodate more Renewable Energy (RE) sources. This paper proposes a robust and effective approach to coordinate customers’ resources and manage voltage rise in residential LV networks. PV is considered as the customer RE source. The suggested coordination approach in this paper includes both localized control strategy, based on local measurement, and distributed control strategy based on consensus algorithm. This approach can completely avoid maximum permissible voltage limit violation. A typical residential LV network is used as the case study where the simulated results are shown to verify the effectiveness of the proposed approach.
Overvoltage prevention in LV smart grid using customer resources coordination
Mokhtari, G. (Autor:in) / Nourbakhsh, G. (Autor:in) / Zare, F. (Autor:in) / Ghosh, A. (Autor:in)
Energy and Buildings ; 61 ; 387-395
06.02.2013
9 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Overvoltage prevention in LV smart grid using customer resources coordination
Online Contents | 2013
|Avoiding PV-Induced Overvoltage through Grid-Connected Batteries Using Model Predictive Control
DOAJ | 2023
|DOAJ | 2022
|Engineering Index Backfile | 1959
Engineering Index Backfile | 1927
|