Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Neurofuzzy modelling of construction projects' duration II: application
The first paper of this two-paper series has developed an understanding of neurofuzzy concept modelling techniques. This second paper demonstrates the power and versatility of neurofuzzy methods when applied to the determination of construction project duration. The paper explains data selection and preprocessing, the modelling process and optimization of developed models. The paper also presents and discusses the results generated by the developed model.
Neurofuzzy modelling of construction projects' duration II: application
The first paper of this two-paper series has developed an understanding of neurofuzzy concept modelling techniques. This second paper demonstrates the power and versatility of neurofuzzy methods when applied to the determination of construction project duration. The paper explains data selection and preprocessing, the modelling process and optimization of developed models. The paper also presents and discusses the results generated by the developed model.
Neurofuzzy modelling of construction projects' duration II: application
BOUSSABAINE, A.H. (Autor:in)
Engineering, Construction and Architectural Management ; 8 ; 114-129
01.02.2001
16 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Neurofuzzy modelling of construction projects' duration II: application
Online Contents | 2001
|Neurofuzzy modelling of construction projects' duration I: principles
Online Contents | 2001
|Neurofuzzy modelling of construction projects' duration I: principles
Emerald Group Publishing | 2001
|A neurofuzzy model for predicting the cost and duration of construction projects
British Library Conference Proceedings | 1998
|British Library Conference Proceedings | 2006
|