Construction worker productivity in hot and humid weather conditions
A review of measurement methods at task, crew and project levels
The purpose of this paper shows the effect of hot and humid weather conditions (HHWCs) on workers that has resulted in considerable loss in the construction industry, especially during the hottest periods due to decline in worker productivity (WP). Until the last few decades, there is very limited research on construction WP in HHWCs. Nevertheless, these studies have sparked interests on seeking for the most appropriate methods to assess the impact of HHWCs on construction workers.
This paper begins by reviewing the current measuring methods on WP in HHWCs, follows by presenting the potential impact of HHWCs on WP. The paper highlights the methodological deficiencies, which consequently provides a platform for scholars and practitioners to direct future research to resolve the significant productivity loss due to global warming. This paper highlights the need to identify the limitations and advantages of the current methods to formulate a framework of new approaches to measure the WP in HHWCs.
Results show that the methods used in providing real-time response on the effects of HHWCs on WP in construction at project, task and crew levels are limited. An integration of nonintrusive real-time monitoring system and local weather measurement with real-time data synchronisation and analysis is required to produce suitable information to determine worker health- and safety-related decisions in HHWCs.
The comprehensive literature review makes an original contribution to WP measurements filed in HHWCs in the construction industry. Results of this review provide researchers and practitioners with an insight into challenges associated with the measurements methods and solving practical site measurements issues. The findings will also enable the researchers and practitioners to bridge the identified research gaps in this research field and enhance the ability to provide accurate measures in HHWCs. The proposed research framework may promote potential improvements in the productivity measurements methods, which support researchers and practitioners in developing new innovative methods in HHWCs with the integration of the most recent monitoring technologies.
Construction worker productivity in hot and humid weather conditions
A review of measurement methods at task, crew and project levels
The purpose of this paper shows the effect of hot and humid weather conditions (HHWCs) on workers that has resulted in considerable loss in the construction industry, especially during the hottest periods due to decline in worker productivity (WP). Until the last few decades, there is very limited research on construction WP in HHWCs. Nevertheless, these studies have sparked interests on seeking for the most appropriate methods to assess the impact of HHWCs on construction workers.
This paper begins by reviewing the current measuring methods on WP in HHWCs, follows by presenting the potential impact of HHWCs on WP. The paper highlights the methodological deficiencies, which consequently provides a platform for scholars and practitioners to direct future research to resolve the significant productivity loss due to global warming. This paper highlights the need to identify the limitations and advantages of the current methods to formulate a framework of new approaches to measure the WP in HHWCs.
Results show that the methods used in providing real-time response on the effects of HHWCs on WP in construction at project, task and crew levels are limited. An integration of nonintrusive real-time monitoring system and local weather measurement with real-time data synchronisation and analysis is required to produce suitable information to determine worker health- and safety-related decisions in HHWCs.
The comprehensive literature review makes an original contribution to WP measurements filed in HHWCs in the construction industry. Results of this review provide researchers and practitioners with an insight into challenges associated with the measurements methods and solving practical site measurements issues. The findings will also enable the researchers and practitioners to bridge the identified research gaps in this research field and enhance the ability to provide accurate measures in HHWCs. The proposed research framework may promote potential improvements in the productivity measurements methods, which support researchers and practitioners in developing new innovative methods in HHWCs with the integration of the most recent monitoring technologies.
Construction worker productivity in hot and humid weather conditions
A review of measurement methods at task, crew and project levels
Worker productivity in HHWCs
Moohialdin, Ammar Saeed Mohammed (Autor:in) / Lamari, Fiona (Autor:in) / Miska, Marc (Autor:in) / Trigunarsyah, Bambang (Autor:in)
Engineering, Construction and Architectural Management ; 27 ; 83-108
22.07.2019
26 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Increasing Worker Productivity
British Library Conference Proceedings | 1993
|Weather: A DSS for Estimating Weather Impact on Construction Productivity
British Library Conference Proceedings | 1995
|Occupancy Costs and Worker Productivity
British Library Online Contents | 1996
|