Construction time prediction model for public building projects
The aim of the study was to develop a practical construction time model for public building projects in Addis Ababa, Ethiopia.
This research work used regression analysis and also exploratory scatter and residual plot techniques. Simple and multiple regressions were used for the investigation of the best fit time model. The analyses were carried out using IBM SPSS statistical software, version 20.
The result revealed that the Bromilow time-cost principle was moderately applicable. However, the cubic regression model (CUB) was found a better time-cost relationship. On the contrary, the study has shown a poor relationship between actual time and gross floor area. Furthermore, multiple linear regression analysis (MLR) consists of three statistically significant variables were found a better fit time model.
The study is limited to only six project scope factors. Further research is recommended to include more building projects of similar type and implications of other factors to improve the reliability of the models.
The developed model was not intended as a replacement for detailed construction scheduling techniques. The resulting model is applicable for front-end predictions of construction duration.
The main parties involved in the building projects should apply the model for benchmarking a precise construction time during the early planning phase.
Construction time prediction model for public building projects
The aim of the study was to develop a practical construction time model for public building projects in Addis Ababa, Ethiopia.
This research work used regression analysis and also exploratory scatter and residual plot techniques. Simple and multiple regressions were used for the investigation of the best fit time model. The analyses were carried out using IBM SPSS statistical software, version 20.
The result revealed that the Bromilow time-cost principle was moderately applicable. However, the cubic regression model (CUB) was found a better time-cost relationship. On the contrary, the study has shown a poor relationship between actual time and gross floor area. Furthermore, multiple linear regression analysis (MLR) consists of three statistically significant variables were found a better fit time model.
The study is limited to only six project scope factors. Further research is recommended to include more building projects of similar type and implications of other factors to improve the reliability of the models.
The developed model was not intended as a replacement for detailed construction scheduling techniques. The resulting model is applicable for front-end predictions of construction duration.
The main parties involved in the building projects should apply the model for benchmarking a precise construction time during the early planning phase.
Construction time prediction model for public building projects
Construction time prediction for buildings
Alemu, Shambel Kifle (Autor:in)
Engineering, Construction and Architectural Management ; 29 ; 2183-2206
02.06.2021
24 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Procurement Routes in Public Building and Construction Projects
Online Contents | 2006
|Procurement Routes in Public Building and Construction Projects
British Library Online Contents | 2006
|Building Information Modeling (BIM) partnering framework for public construction projects
British Library Online Contents | 2013
|Building Information Modeling (BIM) partnering framework for public construction projects
Online Contents | 2013
|Modelling construction completion cost in Ghana public sector building projects
Online Contents | 2019
|