Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Environmental index for Finnish construction sites
– The primary aim of this study was to better understand the grounds to develop a monitoring and performance measurement method to support the environmental management of construction operations. The practical purpose was to improve environmental activities in construction sites. This study helps to fill the gap between environmental needs and practices on construction sites.
– Action research was the principal research method. The research procedure was executed in collaboration with construction companies. The EICS meter was originally developed to create rules for environmental competition between construction sites. Since the time of this competition, the meter has been further improved in other studies.
– Based on the literature and feedback gained in the testing round of the EICS, five relevant categories were formulated to evaluate environmental operations: environmental information management, waste management, material handling and shielding, energy use and emissions. A simple index method was applied for these five categories. Furthermore, observation targets and acceptance criteria were defined for these categories. The meter supports environmental management in practise. The method can be used to analyse the starting point level when developing environmental processes.
– This study offers insights based on action research for both academics and practitioners. The meter is outlined for Nordic conditions, but the structure of the method is also suitable elsewhere. The national demands can be locally fine-tuned.
Environmental index for Finnish construction sites
– The primary aim of this study was to better understand the grounds to develop a monitoring and performance measurement method to support the environmental management of construction operations. The practical purpose was to improve environmental activities in construction sites. This study helps to fill the gap between environmental needs and practices on construction sites.
– Action research was the principal research method. The research procedure was executed in collaboration with construction companies. The EICS meter was originally developed to create rules for environmental competition between construction sites. Since the time of this competition, the meter has been further improved in other studies.
– Based on the literature and feedback gained in the testing round of the EICS, five relevant categories were formulated to evaluate environmental operations: environmental information management, waste management, material handling and shielding, energy use and emissions. A simple index method was applied for these five categories. Furthermore, observation targets and acceptance criteria were defined for these categories. The meter supports environmental management in practise. The method can be used to analyse the starting point level when developing environmental processes.
– This study offers insights based on action research for both academics and practitioners. The meter is outlined for Nordic conditions, but the structure of the method is also suitable elsewhere. The national demands can be locally fine-tuned.
Environmental index for Finnish construction sites
Teriö, Olli (Autor:in) / Sorri, Jaakko (Autor:in) / Kähkönen, Kalle (Autor:in) / Hämäläinen, Jukka (Autor:in)
Construction Innovation ; 14 ; 245-262
01.04.2014
18 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Environmental index for Finnish construction sites
Online Contents | 2014
|Environmental index for Finnish construction sites
British Library Online Contents | 2014
|Finnish sauna : design and construction
TIBKAT | 2007
|Finnish sauna : design, construction, and maintenance
TIBKAT | 2000
Environmental Impacts Assessment on Construction Sites
ASCE | 2012
|