Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A critical investigation of the briefing process in Hong Kong's construction industry
–
This paper aims to investigate briefing in the construction industry in Hong Kong. Specifically, it sets out to discover the current practices on briefing in the industry and the limitations of these practices.
This study consists of a literature review and a pilot study, structured focus group interviews and semi-structured interviews.
The study has revealed that current practices, although have been in operation for a long time, have a number of limitations such as lacking in a comprehensive framework; lacking in identification of client requirements; lacking in contributions from clients; lacking in involvement of stakeholders; and inadequate time spent on the briefing. It is concluded that these limitations must be properly addressed by the industry in order to improve the briefing and to avoid subsequent problems in the design and construction phases, and that more resources should be allocated.
So far, little work has been undertaken to study the practice of briefing in sufficient depth in the construction industry in Hong Kong. This paper improves our comprehension of the nature of client requirements and provides valuable insights into the details of briefing in the public and private sectors of the local industry.
A critical investigation of the briefing process in Hong Kong's construction industry
–
This paper aims to investigate briefing in the construction industry in Hong Kong. Specifically, it sets out to discover the current practices on briefing in the industry and the limitations of these practices.
This study consists of a literature review and a pilot study, structured focus group interviews and semi-structured interviews.
The study has revealed that current practices, although have been in operation for a long time, have a number of limitations such as lacking in a comprehensive framework; lacking in identification of client requirements; lacking in contributions from clients; lacking in involvement of stakeholders; and inadequate time spent on the briefing. It is concluded that these limitations must be properly addressed by the industry in order to improve the briefing and to avoid subsequent problems in the design and construction phases, and that more resources should be allocated.
So far, little work has been undertaken to study the practice of briefing in sufficient depth in the construction industry in Hong Kong. This paper improves our comprehension of the nature of client requirements and provides valuable insights into the details of briefing in the public and private sectors of the local industry.
A critical investigation of the briefing process in Hong Kong's construction industry
Shen, Geoffrey Q.P. (Autor:in) / Chung, Jacky K.H. (Autor:in)
Facilities ; 24 ; 510-522
01.11.2006
13 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
A critical investigation of the briefing process in Hong Kong's construction industry
Online Contents | 2006
|An Analytical Review of the Briefing Practice in Hong Kong’s Construction Industry
Taylor & Francis Verlag | 2005
|Labour and skill shortages in Hong Kong's construction industry
Online Contents | 2016
|Labour and skill shortages in Hong Kong’s construction industry
Emerald Group Publishing | 2016
|Behavioural safety management in Hong Kong's construction industry: Success and limitations
British Library Conference Proceedings | 1996
|