Decision-makers' perceptions in the formulation of prequalification criteria
Contractor prequalification involves the establishment of a standard for measuring and assessing the capabilities of potential tenderers. The required standard is based on a set of prequalification criteria (PQC) that is intended to reflect the objectives of the client and the requirements of the project. However, many pre-qualifiers compile a set of PQC according to their own idiosyncratic perceptions of the importance of individual PQC. As a result, sets of PQC, and hence prequalification standards, vary between prequalifiers. This paper reports on an investigation of the nature of the divergencies of the perceived importance of individual PQC by different groups of prequalifiers via a large-scale empirical survey conducted in the UK. The results support the conclusion that there are significant systematic differences between groups of prequalifiers, with the individual PQC that contribute most to the differences being the method of procurement, size of project, standard of quality, financial stability, project complexity, claim and contractual dispute and length of time in business.
Decision-makers' perceptions in the formulation of prequalification criteria
Contractor prequalification involves the establishment of a standard for measuring and assessing the capabilities of potential tenderers. The required standard is based on a set of prequalification criteria (PQC) that is intended to reflect the objectives of the client and the requirements of the project. However, many pre-qualifiers compile a set of PQC according to their own idiosyncratic perceptions of the importance of individual PQC. As a result, sets of PQC, and hence prequalification standards, vary between prequalifiers. This paper reports on an investigation of the nature of the divergencies of the perceived importance of individual PQC by different groups of prequalifiers via a large-scale empirical survey conducted in the UK. The results support the conclusion that there are significant systematic differences between groups of prequalifiers, with the individual PQC that contribute most to the differences being the method of procurement, size of project, standard of quality, financial stability, project complexity, claim and contractual dispute and length of time in business.
Decision-makers' perceptions in the formulation of prequalification criteria
THOMAS NG, S. (Autor:in) / MARTIN SKITMORE, R. (Autor:in) / SMITH, NIGEL J. (Autor:in)
Engineering, Construction and Architectural Management ; 6 ; 155-165
01.02.1999
11 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Original Articles - Decision-makers' perceptions in the formulation of prequalification criteria
Online Contents | 1999
|Uk civil engineering practitioners' perceptions of contractor prequalification criteria
British Library Conference Proceedings | 2000
|Evaluating prequalification criteria in contractor selection
Elsevier | 1994
|Evaluating prequalification criteria in contractor selection
British Library Online Contents | 1994
|Client and consultant perspectives of prequalification criteria
Online Contents | 1999
|