Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for onshore or offshore erecting an upstanding construction
Method for onshore or offshore erecting an upstanding construction comprising longitudinal construction parts (9), in particular parts of a windmill, comprising the steps of -providing the longitudinal parts (9) of the construc 5 tion; -transporting the longitudinal parts (9) of the con struction on a vehicle (4, 4', 4'') to an erection site (5); -providing a crane (1) for hoisting the longitudinal parts (9) of the construction; 10 -using the crane (1) for placing the respective longi tudinal parts (9) of the construction on top of each other on a construction base (3) at the erection site (5); -providing the construction base (3) and/or the longi tudinal parts (9) of the construction with a support and guide 15 facility (2) for the crane (1); -arranging that the crane (1) is mountable on the sup port and guide facility (2); and -mounting the crane (1) on the support and guide fa cility (2) of at least one of the construction base (3) and the 20 longitudinal parts (9) of the construction that is placed on the construction base (3), so as to arrange that the crane (1) is movable up and down along the support and guide facility (2) of the construction.
Method for onshore or offshore erecting an upstanding construction
Method for onshore or offshore erecting an upstanding construction comprising longitudinal construction parts (9), in particular parts of a windmill, comprising the steps of -providing the longitudinal parts (9) of the construc 5 tion; -transporting the longitudinal parts (9) of the con struction on a vehicle (4, 4', 4'') to an erection site (5); -providing a crane (1) for hoisting the longitudinal parts (9) of the construction; 10 -using the crane (1) for placing the respective longi tudinal parts (9) of the construction on top of each other on a construction base (3) at the erection site (5); -providing the construction base (3) and/or the longi tudinal parts (9) of the construction with a support and guide 15 facility (2) for the crane (1); -arranging that the crane (1) is mountable on the sup port and guide facility (2); and -mounting the crane (1) on the support and guide fa cility (2) of at least one of the construction base (3) and the 20 longitudinal parts (9) of the construction that is placed on the construction base (3), so as to arrange that the crane (1) is movable up and down along the support and guide facility (2) of the construction.
Method for onshore or offshore erecting an upstanding construction
HELMENS WESSEL (Autor:in)
28.03.2024
Patent
Elektronische Ressource
Englisch
METHOD FOR ONSHORE OR OFFSHORE ERECTING AN UPSTANDING CONSTRUCTION
Europäisches Patentamt | 2018
|METHOD FOR ONSHORE OR OFFSHORE ERECTING AN UPSTANDING CONSTRUCTION
Europäisches Patentamt | 2018
|Apparatus for Onshore or Offshore Erecting an Upstanding Construction
Europäisches Patentamt | 2022
|METHOD FOR ONSHORE OR OFFSHORE ERECTING AN UPSTANDING CONSTRUCTION
Europäisches Patentamt | 2024
|Method for onshore or offshore erecting an upstanding construction
Europäisches Patentamt | 2024
|