Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A METHOD AND MACHINE FOR CONSOLIDATION OF BALLAST OF A TRACK
Consolidation of ballast (2) of a track (3) is carried out in two steps, after cleaning by means of a cleaning machine (4). To that end, cleaned ballast is discharged, thus forming a first ballast layer (29). The track (3), laid upon the same, is set in transverse oscillations by a front stabilising unit (24), and thus the first ballast layer (29) is consolidated. With the aid of a second chute (25), a second ballast layer (30) is formed which is subsequently consolidated by means of a rear stabilising unit (18).
A METHOD AND MACHINE FOR CONSOLIDATION OF BALLAST OF A TRACK
Consolidation of ballast (2) of a track (3) is carried out in two steps, after cleaning by means of a cleaning machine (4). To that end, cleaned ballast is discharged, thus forming a first ballast layer (29). The track (3), laid upon the same, is set in transverse oscillations by a front stabilising unit (24), and thus the first ballast layer (29) is consolidated. With the aid of a second chute (25), a second ballast layer (30) is formed which is subsequently consolidated by means of a rear stabilising unit (18).
A METHOD AND MACHINE FOR CONSOLIDATION OF BALLAST OF A TRACK
PROCEDE ET MACHINE DE COMPACTAGE DE BALLAST DE VOIE FERREE
THEURER JOSEF (Autor:in) / WOERGOETTER HERBERT (Autor:in)
12.05.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Track Maintenance Machine And Method For Consolidation Of A Ballast Bed
Europäisches Patentamt | 2019
|Track maintenance machine and method for consolidation of a ballast bed
Europäisches Patentamt | 2021
|Engineering Index Backfile | 1956
|PACKING BALLAST TRACK CONSTRUCTION METHOD AND PACKING BALLAST TRACK
Europäisches Patentamt | 2022
|