Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A TOWER CONSTRUCTION AND A METHOD FOR ERECTING THE TOWER CONSTRUCTION
A concrete tower construction (10) comprising; - a foundation (12), - a plurality of prefabricated concrete tower elements (24) each having an outside (32), an inside (34), a material thickness (36) provided there between, and top (38) and bot- tom (40) surfaces, said tower element (24) having a hollow centre, said tower elements (24) are arranged one tower element (24) on top of another forming a column (22) on top of the foundation (12), - a plurality of tendons (28) arranged in the hollow centre, for applying a tension force to the column (22), wherein the tower construction (10) further comprises an upper force distribution element (26) arranged on top of the column (22) and a lower force distribution element (18) arranged in the foundation (12), wherein each tendon (28) is connected to the upper force distribution element (18) and the lower force distribution element (26) by co-operating attachment means (30, 30'). Furthermore a method of erecting said tower construction (10), a tower element and a foundation element is described.
A TOWER CONSTRUCTION AND A METHOD FOR ERECTING THE TOWER CONSTRUCTION
A concrete tower construction (10) comprising; - a foundation (12), - a plurality of prefabricated concrete tower elements (24) each having an outside (32), an inside (34), a material thickness (36) provided there between, and top (38) and bot- tom (40) surfaces, said tower element (24) having a hollow centre, said tower elements (24) are arranged one tower element (24) on top of another forming a column (22) on top of the foundation (12), - a plurality of tendons (28) arranged in the hollow centre, for applying a tension force to the column (22), wherein the tower construction (10) further comprises an upper force distribution element (26) arranged on top of the column (22) and a lower force distribution element (18) arranged in the foundation (12), wherein each tendon (28) is connected to the upper force distribution element (18) and the lower force distribution element (26) by co-operating attachment means (30, 30'). Furthermore a method of erecting said tower construction (10), a tower element and a foundation element is described.
A TOWER CONSTRUCTION AND A METHOD FOR ERECTING THE TOWER CONSTRUCTION
CONSTRUCTION DE TOUR ET SON PROCEDE D'ERECTION
HANGEL JORGEN (Autor:in)
16.08.2016
Patent
Elektronische Ressource
Englisch
Tower Construction and a Method for Erecting the Tower Construction
Europäisches Patentamt | 2015
|Tower erecting device for electric power construction
Europäisches Patentamt | 2023
|