PROCESS FOR INSTALLING AN OFFSHORE TOWER
Process for installing an offshore tower, specifically a substructure, which basically comprises the following steps: a) dry manufacturing a foundation comprising a block (1, 1') basically made of concrete and dry manufacturing a base section (25) of a shaft (2); b) applying said base section to said foundation block, forming a unit called the "starting unit"; c) moving said starting unit to the installation point of said substructure; and d) actuating in a controlled manner, first ballast valve means in such a manner that said starting unit sinks until resting on the seabed; having placed said foundation block or said starting unit in the body of water where the installation point said substructure is located.
L'invention porte sur un procédé d'installation d'une tour en mer, plus particulièrement d'une infrastructure. Ledit procédé comporte essentiellement les étapes suivantes : a) la fabrication à sec d'une fondation comportant un bloc (1, 1') constitué essentiellement de béton et la fabrication à sec d'une section de base (25) d'un arbre (2); b) l'application de ladite section de base sur ledit bloc de fondation, formant une unité appelée l'« unité de départ »; c) le déplacement de ladite unité de départ vers le point d'installation de ladite infrastructure, et d) l'actionnement, d'une manière commandée, d'un premier moyen de soupape de ballast de sorte que ladite unité de départ s'enfonce jusqu'à reposer sur le fond océanique; ledit bloc de fondation ou ladite unité de départ ayant été placé dans l'étendue d'eau où le point d'installation de ladite infrastructure est situé.
PROCESS FOR INSTALLING AN OFFSHORE TOWER
Process for installing an offshore tower, specifically a substructure, which basically comprises the following steps: a) dry manufacturing a foundation comprising a block (1, 1') basically made of concrete and dry manufacturing a base section (25) of a shaft (2); b) applying said base section to said foundation block, forming a unit called the "starting unit"; c) moving said starting unit to the installation point of said substructure; and d) actuating in a controlled manner, first ballast valve means in such a manner that said starting unit sinks until resting on the seabed; having placed said foundation block or said starting unit in the body of water where the installation point said substructure is located.
L'invention porte sur un procédé d'installation d'une tour en mer, plus particulièrement d'une infrastructure. Ledit procédé comporte essentiellement les étapes suivantes : a) la fabrication à sec d'une fondation comportant un bloc (1, 1') constitué essentiellement de béton et la fabrication à sec d'une section de base (25) d'un arbre (2); b) l'application de ladite section de base sur ledit bloc de fondation, formant une unité appelée l'« unité de départ »; c) le déplacement de ladite unité de départ vers le point d'installation de ladite infrastructure, et d) l'actionnement, d'une manière commandée, d'un premier moyen de soupape de ballast de sorte que ladite unité de départ s'enfonce jusqu'à reposer sur le fond océanique; ledit bloc de fondation ou ladite unité de départ ayant été placé dans l'étendue d'eau où le point d'installation de ladite infrastructure est situé.
PROCESS FOR INSTALLING AN OFFSHORE TOWER
PROCEDE D'INSTALLATION DE TOUR EN MER
FERNANDEZ GOMEZ MIGUEL ANGEL (Autor:in) / JIMENO CHUECA JOSE EMILIO (Autor:in)
11.02.2020
Patent
Elektronische Ressource
Englisch