Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A RETAINING WALL METHOD OF PRECAST BLOCK TO PREVENT LANDSLIDE
A plurality of precast blocks place in a layered interlocking relation with each other to form a wall based on configuration of the plurality of precast blocks, where each of said plurality of precast blocks has a pin hole extending therethrough. A wire rope passes through the pin hole of each of a first set of precast blocks of the plurality of precast blocks, where the wire rope is secured to the earth by attaching said wire rope to a threaded pile of each of a second set of blocks selected from the plurality of precast blocks being inserted horizontally inside the earth. The wire rope passes across a road from underneath the road to insert a threaded pile attached with said wire rope, of each of the first set of precast blocks, vertically inside the earth.
Cette invention concerne des blocs en H préfabriqués (3) qui s'imbriquent les uns avec les autres pour former un mur incliné et des blocs en Y similairement préfabriqués (10) s'imbriquent les uns avec les autres pour former un mur vertical, les deux blocs comprenant un trou de goupille (4) à travers leurs parois latérales. Un câble métallique (5) passe à travers ledit trou de goupille pour réaliser un mur renforcé par clouage horizontal (14) dans la terre (8) de manière adjacente au bloc et par clouage vertical (9) à un niveau supérieur et inférieur. De plus, un câble métallique (5) passe à travers ledit trou de goupille (4) des blocs supérieurs, à partir du dessous de la route, de façon à renforcer un mur/une barrière par clouage renforcé vertical (9) dans la terre à travers la route (2).
A RETAINING WALL METHOD OF PRECAST BLOCK TO PREVENT LANDSLIDE
A plurality of precast blocks place in a layered interlocking relation with each other to form a wall based on configuration of the plurality of precast blocks, where each of said plurality of precast blocks has a pin hole extending therethrough. A wire rope passes through the pin hole of each of a first set of precast blocks of the plurality of precast blocks, where the wire rope is secured to the earth by attaching said wire rope to a threaded pile of each of a second set of blocks selected from the plurality of precast blocks being inserted horizontally inside the earth. The wire rope passes across a road from underneath the road to insert a threaded pile attached with said wire rope, of each of the first set of precast blocks, vertically inside the earth.
Cette invention concerne des blocs en H préfabriqués (3) qui s'imbriquent les uns avec les autres pour former un mur incliné et des blocs en Y similairement préfabriqués (10) s'imbriquent les uns avec les autres pour former un mur vertical, les deux blocs comprenant un trou de goupille (4) à travers leurs parois latérales. Un câble métallique (5) passe à travers ledit trou de goupille pour réaliser un mur renforcé par clouage horizontal (14) dans la terre (8) de manière adjacente au bloc et par clouage vertical (9) à un niveau supérieur et inférieur. De plus, un câble métallique (5) passe à travers ledit trou de goupille (4) des blocs supérieurs, à partir du dessous de la route, de façon à renforcer un mur/une barrière par clouage renforcé vertical (9) dans la terre à travers la route (2).
A RETAINING WALL METHOD OF PRECAST BLOCK TO PREVENT LANDSLIDE
PROCEDE POUR MUR DE SOUTENEMENT DE BLOCS PREFABRIQUES POUR EMPECHER LES GLISSEMENTS DE TERRAIN
LADKAT RAJENDRA VITHAL (Autor:in)
10.05.2022
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Retaining wall method of precast block to prevent landslide
Europäisches Patentamt | 2019
|A retaining wall method of precast block to prevent landslide
Europäisches Patentamt | 2019
|A RETAINING WALL METHOD OF PRECAST BLOCK TO PREVENT LANDSLIDE
Europäisches Patentamt | 2018
|A RETAINING WALL METHOD OF PRECAST BLOCK TO PREVENT LANDSLIDE
Europäisches Patentamt | 2017
|A RETAINING WALL METHOD OF PRECAST BLOCK TO PREVENT LANDSLIDE
Europäisches Patentamt | 2018
|